JHL

JHL Long Lead Rope Elephant Leads

(1)Reviews

£6.78 £8.99 Save Online
Tax included Shipping calculated at checkout.

Color

Additional payment methods

  • Apple Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

JHL Long Lead Rope Elephant Leads

These longer than normal lead ropes from JHL Long Lead Rope Elephant Lead.   The JHL Long Lead Rope Elephant Leads is thick, chunky cotton extra long leadrope, ideal for big horses. The JHL Long Lead Rope Elephant Leads is approximately 2.5m long with an extra large brass trigger clip.

JHL Long Lead Rope Elephant Leads features:
  • Extra thick, long lead rope ideal for big horses
  • Aproximately 2.5m long
  • Extra large brass trigger clip

Product Specification

Delivery and Shipping

Shipping Options For This Product